Glass and Steel

January 30, 2018 – Meyer Borgman Johnson provided erection engineering for a small but spectacular glass and steel pavilion featured in Modern Steel Construction’s January 2018 issue. Set at the front of 100 Federal Street in Boston’s financial district, the structure creates a light-filled entrance to the building. Commissioned by steel fabricator Cives Steel Company – New England Division, MBJ modeled erection sequences, shoring, and lateral bracing, analyzing wind loads for every day of the project throughout the 6-week construction phase. Read the article here.